Pre Install
Here is where the pump will be installed. This is determined off of the size of the room and where the water is leaking in.
Installation
The hole is dug, gravel is pored in around the pump to hold in place and for the water the flow through properly. They will then pore the concrete around and along the drainage. The last steps are making sure it is all connected.
After
Here you can see that it is completely installed.
Interior Discharge
There was an interior discharge line that is ran from the pump, along the baseboard and up the wall to where we could discharge it on the side of the home. If needed, it can also be extended out into the yard.